The report definition appears. For information on editing the report definition, see
"Editing a Custom Report," on page
5 Click Run at the bottom of the report.
On the report page, click the various links on the report for additional information. You can also
export the report to an Excel, CSV, or PDF format by clicking the corresponding link.
32.3 Scheduling a Custom Report
You can schedule a report to run automatically and send out notifications to individuals when it is
ready.
You must have already defined an SMTP e-mail server if you want to send e-mail notifications. This
is done through the SMTP Settings option (Configuration tab > Management Zone Settings panel >
Event and Messaging > SMTP Settings).
1 In ZENworks Control Center, click the Asset Management tab.
2 For license compliance and license allocation reports, click the License Management tab, then
click License Management Reports.
or
For software usage reports, click the Software Usage tab.
or
For contract management reports, click the Contract Management tab, then click Contract
Management Reports.
3 In the Custom Reports panel, open the folder containing the report you want to run.
4 Click the report you want to schedule.
191.
Section 32.5,
Working with Custom Reports 189
Need help?
Do you have a question about the ZENWORKS 10 CONFIGURATION MANAGEMENT SP3 - REFERENCE 10.3 30-03-2010 and is the answer not in the manual?
Questions and answers