3.0 Installation

Wiring Pre-Installation

Main Service Panel

Sub-Panel

AC Circuit Breakers

DC Disconnect

Wire Routing

©2002 Xantrex Technology Inc. All Rights Reserved.
P/N 975-0026-01-01 Rev A 06/2002
If you have an inverter with the SB option, ensure you use the correct circuit
breaker based on the total current rating of your inverter. This circuit breaker
must be located in the utility service panel.
See Table 3-5 on page 41 for maximum recommended breaker sizes.
Loads backed up by the inverter will need to be rerouted from the main service
panel to a sub-panel. This can be done several different ways, depending upon
the installation. Always refer to electrical codes for safe wiring practices.
Always use a properly rated circuit breaker. Depending upon the application,
circuit breakers used to protect the load can be removed from the main service
panel and put into the sub-panel ONLY if the two panels are from the same
manufacturer.
Install a DC disconnect breaker or fuse in the positive battery line. This breaker
protects the DC wiring in the event of an accidental short. Size the breaker in
accordance with the battery cables. Switch this breaker OFF whenever servicing
the batteries.
See DC Disconnect and Overcurrent Protection on page 35 for additional
information and recommended fuse sizes.
Determine all wire routes both to and from the inverter and which knockouts are
best suited for connecting the AC conduits. Possible routing scenarios include:
• AC input wiring from the main utility service panel to the inverter
• AC input wiring from the generator to the inverter (if used)
• DC input wiring from the PV array (wind, hydro, etc.) to the inverter (if used)
• DC input wiring from the batteries to the inverter
• AC output wiring from the inverter to the sub-panel
• Battery temperature sensor cable from the batteries to the inverter (if used)
• Remote control cable to the inverter (if used)
• DC ground from the batteries to an external ground rod
• Load circuit wiring rerouted from the main service panel to the sub-panel
Check for existing electrical or plumbing prior to making cuts in the walls. Cut
holes in the walls at appropriate locations for routing wiring/cables.