Connection on the franking machine
Power connection
Installation and commissioning
• Connect the feeder connection cable to the
CAN-BUS interface of the franking
machine. Screw the connector on tightly.
• Plug the power cable into the power con-
nection for the feeder.
• Only then plug the power cable into the
power outlet.
Filling the sealant tank with sealing fluid
Warning! Electrical hazard due to short
circuits. Be extremely careful when handling
fluids. When filling the tank, make sure that
no live parts become wet. However, if this
does occur: Immediately disconnect the
power plug. Have the PostBase Fusion
checked by the Customer Support before
using it again.