Download Print this page

Step 4: Connecting The Postbase Fusion - FP PostBase Fusion Installation And Safety

Mailing system
Hide thumbs Also See for PostBase Fusion:

Advertisement

13
Installation and commissioning
• Fill sealer with SEALIT sealing fluid.
• Check the filling level. The sealer should
be filled roughly up to the 'max' mark.
• Close the filling opening with the cover.
• If necessary: Dry the sealer outside.
Note: It may take a few minutes for the fluid
to fully prepare the moistening deck and
blade.
Step 4:
Connecting the PostBase Fusion
Caution! If the PostBase Fusion was previ-
ously in a cold environment (i.e. below 10 °C /
50 °F): Wait at least two hours after unpack-
ing before connecting the franking machine.
The PostBase Fusion needs this time to
adapt to the environmental conditions.
Caution! Do not connect the
PostBase Fusion Feeder (the optional
automatic feeder) until Step 7. The
PostBase Fusion franking machine must be
fully installed to do this. Otherwise the
Feeder will not be recognised by the franking
machine. The will not work.

Advertisement

loading
Need help?

Need help?

Do you have a question about the PostBase Fusion and is the answer not in the manual?

Subscribe to Our Youtube Channel