Sterilization Process
4A
OPEN
90°
CLOSE
6 - Open the hot inlet
isolating ball valve
9 - Refit the hot inlet plug into the hot
position and the cold into the cold
position and refit the covers
By carrying out the above procedure you are sterilizing the complete tap with hot water
© Intatec Ltd 2016
REMOVE
7 - Open the isolating ball valve on
the hot supply to start sterilization
procedure
90°
CLOSE
10 - Open the isolating ball
valve, water may start
to flow but will stop
automatically
15
5 - Fit the cold inlet plug into the hot position
and the hot into the cold position
Wave hand in
front of sensor
to start water
flow.
See table below
for times needed
Temperature
OPEN
60˚C
65˚C
70˚C
11 - Disinfection times based
OPEN
90°
CLOSE
8 - Close the isolating ball
valve
Disinfection time
20 minutes
10 minutes
5 minutes
on water temperature
Need help?
Do you have a question about the HTMWMBCP and is the answer not in the manual?