Piping Installation; Preparing Refrigerant Piping; Refrigerant Piping Requirements; Refrigerant Piping Material - Daikin VRV 5-S User Reference Manual

System air conditioner
Table of Contents

Advertisement

18 Piping installation

In this chapter

18.1 Preparing refrigerant piping

18.1.1 Refrigerant piping requirements

18.1.2 Refrigerant piping material

RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A - 2024.02
CAUTION
See
"3  Specific installer safety
complies with all safety regulations.
18.1
Preparing refrigerant piping ...................................................................................................................................................
18.1.1
Refrigerant piping requirements ...........................................................................................................................
18.1.2
Refrigerant piping material....................................................................................................................................
18.1.3
Refrigerant piping insulation .................................................................................................................................
18.1.4
To select the piping size.........................................................................................................................................
18.1.5
To select refrigerant branch kits............................................................................................................................
18.1.6
Installation limitations............................................................................................................................................
18.1.7
Refrigerant piping length and height difference...................................................................................................
18.2
Connecting the refrigerant piping..........................................................................................................................................
18.2.1
About connecting the refrigerant piping...............................................................................................................
18.2.2
Precautions when connecting the refrigerant piping ...........................................................................................
18.2.3
Pipe bending guidelines .........................................................................................................................................
18.2.4
Using the stop valve and service port....................................................................................................................
18.2.5
To remove the pinched pipes ................................................................................................................................
18.2.6
To braze the pipe end ............................................................................................................................................
18.2.7
To connect the refrigerant piping to the outdoor unit .........................................................................................
18.2.8
To connect the refrigerant branching kit .............................................................................................................. 102
18.3
Checking the refrigerant piping.............................................................................................................................................. 102
18.3.1
About checking the refrigerant piping................................................................................................................... 102
18.3.2
Checking refrigerant piping: General guidelines ................................................................................................... 103
18.3.3
Checking refrigerant piping: Setup ........................................................................................................................ 104
18.3.4
To perform a leak test............................................................................................................................................ 104
18.3.5
To perform vacuum drying .................................................................................................................................... 105
18.3.6
To insulate the refrigerant piping.......................................................................................................................... 106
18.3.7
To check for leaks after charging refrigerant ........................................................................................................ 107
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant piping.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Foreign materials inside pipes (including oils for fabrication) must be ≤30  mg/
10 m.
Piping material: phosphoric acid deoxidised seamless copper
Flare connections: Only use annealed material.
Piping temper grade and thickness:
instructions"  [
 8].
18
Piping installation
|
4
  14] to make sure this installation
"2  General safety
Installer and user reference guide
87
87
87
88
88
90
91
92
94
94
95
96
96
98
99
99
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv 5Rxysa8amy1bRxysa10amy1bRxysa12amy1b

Table of Contents