7
|
Operation
7.4.3 To use the dry program (WITH cool/heat changeover remote control switch)
7.5 Adjusting the air flow direction
7.5.1 About the air flow flap
Installer and user reference guide
34
To stop
4 Press the ON/OFF button on the user interface once again.
Result: The operation lamp goes out and the system stops operating.
NOTICE
Do not turn off power immediately after the unit stops, but wait for at least 5
minutes.
To start
1 Select cooling operation mode with the cool/heat changeover remote control
switch.
1
1
2 Press the operation mode selector button on the user interface several times
and select
(program dry operation).
3 Press the ON/OFF button of the user interface.
Result: The operation lamp lights up and the system starts operating.
4 Press the air flow direction adjust button (only for double-flow, multi-flow,
corner, ceiling-suspended and wall-mounted). Refer to
4
flow
direction" [
34] for details.
To stop
5 Press the ON/OFF button on the user interface once again.
Result: The operation lamp goes out and the system stops operating.
NOTICE
Do not turn off power immediately after the unit stops, but wait for at least 5
minutes.
Refer to the operation manual of the user interface.
Air flow flap types:
▪
Double flow + multi-flow units
▪
Corner units
"7.5 Adjusting the air
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A – 2024.02