Scheduled Maintenance; Daily Maintenance Operations; Setting Up The Operation; Cleaning The Frame And Painted Parts - Technogym Total Trunk Service Maintenance Manual

Table of Contents

Advertisement

Total Trunk: Service & Maintenance Manual - rev. 1.5

10. SCHEDULED MAINTENANCE

To keep the machine in perfect working order, it is necessary to carry out certain scheduled
maintenance actions in order to forestall possible problems. There are essentially 3 types of
maintenance operations:

• Daily maintenance operations;

• Monthly maintenance operations;
• Twice-yearly maintenance operations.
The prescribed frequency differs for each type of operation, as does the required level of operator
qualification. The following paragraphs detail the recommended procedures.
10.1.
DAILY MAINTENANCE OPERATIONS
These operations can be carried out by the machine owner and do not require any
special skills.
The daily maintenance operations are simple cleaning actions for the purposes of general hygiene.
For daily maintenance, proceed as follows:
10.1.1. S
ETTING UP THE OPERATION
1. Turn off the machine by placing the switch in position 0 (OFF).
2. Unplug the mains lead from the wall outlet.
10.1.2. C
LEANING THE FRAME AND PAINTED PARTS
1. Using a cloth moistened with a solution of water and mild soap (non acidic), clean the frame
and painted parts of the machine.
ATTENTION: do not use alcohol, petrol or chemical products in general.
10.1.3. C
LEANING THE UPHOLSTERED PARTS
1. Using a cloth moistened with a solution of mild (non acidic) soap and water, clean the
upholstered parts of the machine.
ATTENTION: do not use alcohol, petrol or other chemical products.
10.1.4. B
ACKUP DATA
1. Carry out the backup procedure described in paragraph 6.8. "Backup and restore procedure".
Pagina 10.1

Advertisement

Table of Contents
loading

Table of Contents