Camus Hydronics DynaMax DMH201 Installation And Service Manual page 40

Gas fired residential commercial stainless steel boilers
Table of Contents

Advertisement

Description
Upon a call for heat the lead
boiler will fire to the specified
base load rate (80%). If the
temperature is not within
o
Error threshold (5
F) of
setpoint after Interstage
delay (2 minutes) a lag boiler
will be brought online and
will also fire at the base load
rate specified.
Modulation of boilers will
only occur after all boilers in
the Lead Lag system are firing
at the specified base load
rate (80%).
Electrical Connection(s)
Programming Instructions
1) Place both toggle switches in LOCAL
2) Press
and select Login
3)
Select Advanced Setup
1) Select Lead Lag Config
2) Select Lead Lag Master Config
3) Select Base load common rate = 80.0%, and press
36

Advertisement

Table of Contents
loading

Table of Contents