10
Operation
(continued)
G. Sequence of Operation
Boiler status is shown in the lower right corner of the Home Screen (see Figure 10-3). After limits have been
established, the boiler sequence progresses as shown in Table 10-11 and Figure 10-12.
106308-05 - 3/23
APEX
Figure 10-12: Sequence of Operation
Figure 10-13: Home Screen Details
Installation, Operating, & Service Instructions
83