5
Condensate Disposal
B. Condensate Neutralizer Installation
1. Some jurisdictions may require that the
condensate be neutralized before being
disposed of. Follow local codes pertaining to
condensate disposal.
2. A condensate neutralizer kit (P/N 101867-01)
is available as optional equipment. Follow local
codes and instructions enclosed with the kit for
condensate neutralizer installation.
40
(continued)
Figure 5-2: Condensate Trap and Drain Line
APEX
Installation, Operating, & Service Instructions
3. Limestone chips will get coated by neutral
salts (product of chemical reaction between
limestone and acidic condensate) and lose
neutralizing effectiveness over time. Therefore,
periodic condensate neutralizer maintenance
and limestone chip replacement must be
performed. A pH test or acid test kits are
available from HVAC/plumbing distributors and
should be used to measure condensate acidity
before/after neutralizer thus indicating a need
for service and chip replacement.
106308-05 - 3/23