Sign In
Upload
Manuals
Brands
Thermal Solutions Manuals
Boiler
ARC-3500
Thermal Solutions ARC-3500 Manuals
Manuals and User Guides for Thermal Solutions ARC-3500. We have
1
Thermal Solutions ARC-3500 manual available for free PDF download: Installation & Operation Manual
Thermal Solutions ARC-3500 Installation & Operation Manual (100 pages)
Brand:
Thermal Solutions
| Category:
Boiler
| Size: 13.28 MB
Table of Contents
Table of Contents
2
Introduction
5
Important Information
5
Disclaimers and Local Codes
5
Test and Inspections
6
Component Description
6
Table 1: Water Flow Switch Settings
6
Figure 1: Arctic 1000 External Boiler Connections
7
Figure 2: Arctic 1500-3000 External Boiler
7
Connections
7
Figure 3: Arctic 3500-6000 External Boiler Connections
7
Installation Conformance
8
Boiler Foundation
8
Clearance and Serviceability
8
Ambient Boiler Room Temperatures
8
Pre-Installation
8
Figure 4: Clearances and Serviceability
9
Table 2: Clearances and Serviceability
9
Boiler Water and Condensate Connections
10
Installation
10
Condensate Trap/Drain Assembly
11
Figure 5: Condensate Drain Trap
11
Figure 6: Condensate Assembly Orientation
11
Table 3: Typical Condensate Flow Rate
11
Gas Supply Connections
12
Venting
15
Field Installation
16
Venting Design Requirements
16
Table 4: Vent and Combustion Air Pipe Diameters
17
Table 5: Vent and Combustion Air Equivalent Length
17
Table 6: Vent Air Pressure Drop Data
18
Table 7: Combustion Air Pressure Drop Data
19
Table 8: Combustion Air and Flue Gas Requirements
20
Table 9: Approved Vent Manufacturers and
20
Table 10: Stainless Steel and CPVC Vent Adapters
20
Table 11: Polypropylene Vent Adapters
21
Table 12: Stainless Steel Vent and Intake
21
Table 13: Polypropylene Vent and Intake
21
Table 14: Recommended Venting Configurations
22
General Termination
23
Figure 7: Vent Terminal Clearances
24
Table 15: Other than Direct Vent Terminal
25
Table 16: Table of Acceptable Terminations
26
Vent and Combustion Air Terminations
27
Figure 8: Horizontal Sidewall Termination
28
Figure 9: Slopped Roof Termination
28
Multiple Appliance Terminations
29
Figure 10: Flat Roof Vent Terminations
29
Terminal Installation
30
Figure 11: Multiple Appliance Direct Vent
31
Termination
31
Polypropylene Venting
32
Optional Room Air for Combustion
32
Figure 12: Flexible Vent in Masonry Chimney with
35
Massachusetts
36
Requirements
38
Table 17: Electrical Requirements
38
Gas Supply Requirements
39
Sound Pressure Levels
39
Table 18: Gas Supply Requirements
39
Table 19: Sound Pressure Levels
39
Table 22: Water Flow Rates for Primary/Secondary
40
Table 23: Water Flow Rates for Primary/Secondary
40
Table 20: Minimum Water Flow Rates for Variable
40
Table 21: Maximum Water Flow Rate for Variable
40
Boiler out Procedure
41
Before Operation
41
Table 24: Water Flow Rates for Constant Volume
41
Table 25: GPM Increase for Glycol System
41
Replacement Boiler Installations
42
Draining and Refilling the Boiler & System
42
Table 26: Chemical Agents and Effects
43
System Start-Up
44
Table 27: Recommended Feed Water Limits
44
System Check
45
Power the Boiler
45
Figure 13: Dungs Valve
47
Figure 14: Siemens Valves
47
Table 28: Siemens Nominal Low Fire
47
Finish Commissioning the Arctic 1000 - 6000
49
Table 29: Safety Device Tests
50
Service, Maintenance, and Inspection
51
Figure 15: Arctic 1000-3000 Ignition Assembly
52
Figure 16: Arctic 3500-6000 Ignition Assembly
53
Figure 17: Panel Removal in Preparation for Tube
54
Figure 18: Panel Removal in Preparation for Tube
54
Figure 19: Panel Removal in Preparation for Tube
55
Figure 20: Tube Puller Insertion
56
Table 30: Safety and Operating Controls
58
Table 31: General Troubleshooting
59
Appendix A: Sizing Gas Piping
60
Table 32: Maximum Gas Capacity of Schedule
60
Table 33: Equivalent Lengths of Standard Pipe
61
Table 34: Specific Gravity Correction Factors
61
Appendix B: Air Switch Adjustment Arctic 1500-6000
62
Appendix C: Venting Diagrams
63
Figure 21: Typical Horizontal Vent Piping
63
Figure 22: Typical Vertical Pressurized Venting
63
Appendix D: Combustion Air Diagrams
64
Figure 23: Typical Horizontal Air Intake Piping
64
Figure 24: Typical Vertical Air Intake Piping
64
Appendix E: Boiler Piping Diagrams
65
Figure 25: Single Boiler, Primary / Secondary
65
Figure 26: Multiple Boilers, Primary Reverse-Return
66
Figure 27: Multiple Boilers, Primary / Secondary
67
Figure 28: Multiple Boilers, Primary / Secondary
68
Figure 29: Multiple Boilers, Primary / Secondary
69
Appendix F: Water Flow Pressure Drops
70
Appendix G: Wiring Diagrams
72
Figure 30: Arctic 1000 Wiring Diagram
72
Figure 31: Arctic 1500 to Arctic 3000 115 VAC Single
74
Figure 32: Arctic 1500 to Arctic 3000 208 - 230 VAC
76
Figure 33: Arctic 2000 to Arctic 3000 208-460 VAC
78
Three Phase Wiring Diagram
78
Figure 34: Arctic 1500 to Arctic 3000 High Turndown
80
VAC Single or
80
Figure 35: Arctic 1500 to Arctic 3000 Dual Fuel
84
Figure 36: Arctic 3500 to Arctic 6000 208-460 VAC
88
Figure 37: Arctic 3500 to Arctic 6000 Dual Fuel 208-460 VAC Three Phase Wiring Diagram
92
Appendix H: Thermal Solutions (Seller) Limited Warranty
97
Appendix I: Installation & Startup Report
98
Advertisement
Advertisement
Related Products
Thermal Solutions Arctic
Thermal Solutions Arctic 2000
Thermal Solutions ARCTIC Series
Thermal Solutions ARC-2500
Thermal Solutions ARC-3000
Thermal Solutions ARC-5500
Thermal Solutions ARC-1000
Thermal Solutions ARC-4500
Thermal Solutions ARC-1500
Thermal Solutions APEX APX525C
Thermal Solutions Categories
Boiler
Water Heater
Controller
Water Pump
Touch Panel
More Thermal Solutions Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL