Huawei UPS5000-E-125 kVA User Manual page 135

Hide thumbs Also See for UPS5000-E-125 kVA:
Table of Contents

Advertisement

UPS5000-E-125 kVA
User Manual (Integrated UPS 3.0, 02291136)
Figure 8-2 Removing the copper bar
Step 4 Switch off the new circuit breaker, install it using a jig, and close the handle.
Figure 8-3 Closing the handle
Step 5 Reinstall the circuit breaker protective cover, switch on the circuit breaker, and
check that the load works properly.
----End
Issue 01 (2022-09-26)
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Replacing a Circuit Breaker
128

Advertisement

Table of Contents
loading

Table of Contents