Figure 8 Changing the pump tubing

For changing the pump tubing please proceed as follows:
1. Unplug the pump from the mains voltage. The device needs to be voltage free.
2.
Open tube connections at the pump;
3. Press conveying belt
4. Take away conveying belt
connectors;
5. Press the two contact pulleys
springs have to be changed (see chapter 15.2);
6. Put the new tubing set
Warning
7. Put the conveying belt
8. Press conveying belt at the recessed grips and simultaneously turn the S-bolt
Switch on pump.
9.
18
If you return the hose pump to M&C customer service for repair, we will ask for
information concerning the delivered liquid.
The pump should be cleaned of hazardous or highly aggressive contaminants
prior to return shipment.
2
S-bolt
5
springs
at the recessed grips and turn S-bolt
and remove the old tubing set
and check whether the spring pressure is still sufficient, if not, the contact
with the tube connectors into the guides of the conveying belt
Only the usage of the original tubing set guarantees a proper functionality.
Never lubricate the tube.
Before mounting the pump check all parts for contaminations and clean if necessary.
with the new tubing
SR25 | 1.01.01
3
Tubing set
clockwise up to limit stop;
from the guides by pulling on the tube
into the dovetail guide of the pump body;
;
anticlockwise until it snaps;
www.mc-techgroup.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sr25.1Sr25.2-gSr25.1/ex

Table of Contents