Changing The Pump Tubing; Figure 7 Changing The Pump Tubing; Figure 8 Different Pump Tube Sizes - M&C SR Series Instruction Manual

Peristaltic pump
Hide thumbs Also See for SR Series:
Table of Contents

Advertisement

15.1 CHANGING THE PUMP TUBING

1 Conveying belt
4 contact pulley
Figure 7
Changing the pump tubing
For changing the pump tubing please proceed as follows:
Unplug the pump from the mains voltage. The device needs to be voltage free.
Press conveying belt
Take away conveying belt
tube connectors;
Press the two contact pulleys
the contact springs have to be changed (see chapter 15.2);
Put the new tubing set
Note
Put the conveying belt
Press conveying belt at the recessed grips and simultaneously turn the S-bolt
until it snaps;
Switch on pump.
Figure 8
Different pump tube sizes
18
2 S-bolt
3 Tubing set
5 springs
at the recessed grips and turn S-bolt
and remove the old tubing set
and check whether the spring pressure is still sufficient, if not,
with the tube connectors into the guides of the conveying belt
Only the usage of the original tubing set guarantees a proper functionality.
Never lubricate the tube.
Before mounting the pump check all parts for contaminations and clean if
necessary.
with the new tubing
SR25.X-X | 1.01.01
clockwise up to limit stop;
from the guides by pulling on the
into the dovetail guide of the pump body;
www.mc-techgroup.com
;
anticlockwise

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents