9.2 Maintenance plan

Maintenance
Turbidity test of wastewater and documenting the
result
Visual inspection
Replace the filter cartridge and activated carbon mat
Leakage test

9.3 Maintenance work

For maintenance work to be carried out, the following prerequisites must be fulfilled and the respective 
preparatory tasks must have been completed.
40 | 64
Installation and operating manual
Interval
Weekly
Weekly
Mandatory in case of a negative result of the
turbidity test
If the level indicator's red marking is visible
At least annually
Recommendation: After all assembly and
maintenance work on the product