9.2 Maintenance plan
Maintenance
Turbidity test of wastewater and documenting the
result
Visual inspection
Replace the filter cartridge and activated carbon mat
Leakage test
9.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the respective
preparatory tasks must have been completed.
40 | 64
Installation and operating manual
Interval
•
Weekly
•
Weekly
•
Mandatory in case of a negative result of the
turbidity test
•
If the level indicator's red marking is visible
•
At least annually
•
Recommendation: After all assembly and
maintenance work on the product