Cleaning Work - Beko QWIK-PURE CS 400 Installation And Operating Manual

Table of Contents

Advertisement

QWIK-PURE
®
CS

9.3.3.2 Cleaning work

For cleaning work to be carried out, the following prerequisites must be fulfilled and the respective 
preparatory tasks must have been completed.
Tool
No tools necessary
1.
The QWIK-PURE
2.
The assembly unit to be cleaned has been dismantled.
3.
Bring the assembly unit to be cleaned to a washing station with an integrated oil separator.
Image
1.
Transport the cleaned and dried assembly unit to the place of installation of the
QWIK-PURE
2.
Put the QWIK-PURE
48 | 64
Preconditions
Warm water
Cotton cloth or disposable cloth
Preparatory work
CS has been decommissioned.
®
Follow-up work
CS and mount it.
®
CS back into operation (see section "7. Commissioning" on page 34).
®
Material
Description / explanation
Clean the connecting pipe
Flush the measuring chamber with warm water.
Clean pressure relief chamber
Flush the pressure relief chamber with warm water.
Installation and operating manual
Protective equipment
To be worn at all times: