Beko QWIK-PURE CS 400 Installation And Operating Manual page 32

Table of Contents

Advertisement

QWIK-PURE
®
CS
Image
NOTICE
32 | 64
Installation work
Damage due to incorrect hose routing.
Incorrect hose routing can result in property and environmental damage, as well
as impaired operation.
Route all hoses in the shortest possible way.
Install all hoses in such a way that they are free of mechanical stress and
without any kinks.
Lay all hoses in such a way that no mechanical stresses are transferred to the
QWIK-PURE
CS and the minimum bending radii of the respective hose are
®
observed.
Do not lay the hoses in a slack manner (sagging).
Installation and operating manual
Description / explanation
17. Set up the assembled QWIK-PURE
from the tapping point.
0 For optimal hose routing, the knurled head
screw can be loosened in order to rotate the
condensate inlet up to 90 degrees by hand.
After turning it, tighten the knurled head
screw hand-tight.
18. Connect the tapping point with the condensate
inlet of the pressure relief chamber with a hose
and secure it against slipping with a hose clamp.
0 Do not lay the hose in a slack manner
(sagging).
19. Tighten the hose clamps hand-tight.
CS offset 
®

Advertisement

Table of Contents
loading

Table of Contents