Gas Supply Requirements; Sound Pressure Levels; Table 18: Gas Supply Requirements; Table 19: Sound Pressure Levels - Thermal Solutions ARCTIC Series Installation & Operation Manual

Table of Contents

Advertisement

Connect field supplied safety limits or devices using
proper terminals provided in boiler electrical cabinet.
Refer to wiring diagram supplied with boiler for wiring
information.
See Appendix G for sample-wiring diagrams. An as-
built wiring diagram is included with every boiler when
it ships. Contact a Thermal Solutions Representative
or visit the website (www.thermalsolutions.com) for
current wiring options.
B. Gas Supply Requirements
Refer to Table 18 for minimum and maximum gas
supply pressure. When the gas supply pressure
exceeds the maximum, an additional field supplied
step down regulator will be required to reduce the
supply pressure. For proper gas supply sizing refer
to Table 32.
NOTICE
NOTICE
The step down regulator shall be installed at least
60 pipe diameters from the boiler gas inlet manual
shutoff valve and vented to atmosphere. Vent
Limiters are NOT acceptable. This will ensure proper
gas regulation for establishing main flame reliably.
Table 18: Gas Supply Requirements
Arctic
Capacity
Model
1000
1000
1500
1500
2000
2000
2500
2500
3000
3000
3500
3500
4000
4000
4500
4500
5000
5000
5500
5500
6000
6000
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Website: www.thermalsolutions.com
Inlet
Min.
(npt)
(iwc)
1
4
2
4
2
4
2
4
2
4
2
7
2
7
2
7
2
7
2
7
2
7
Phone: 717-239-7642 Fax: 877-501-5212 Email: sales@thermalsolutions.com
C. Sound Pressure Levels
Sound pressure levels were measured at 4-1/2' above
the floor and 3' from the boiler at the front, rear and
two sides. See Table 19 for decibel readings.
Table 19: Sound Pressure Levels
Arctic
Model
1000
1500
2000
2500
3000
D. Pump and Piping Requirements
Pump piping and system piping must meet the
requirements of local codes and jurisdictions.
Good engineering practices should be followed and
considered for each piping system used.
It is advised that the circulating pump for each boiler
be installed as close to the boiler as possible in the
line to the return connection such that system water
is pumped towards the boiler.
Installing circulating pumps so that the water is
pumped away from the boiler is rarely recommended.
Max.
(iwc)
Means to eliminate air from the boiler/piping systems
14
is a must. It is advised that an air separator be
14
installed as close as practical to each boiler in the
14
outlet pipe. Further, an air vent should be installed
at all high points throughout the piping system.
14
14
It is recommended that a water meter be installed
14
in the make-up water system to the boiler system.
14
Scheduled recording of the water meter register
14
will show an indication of a potential slow system
14
leak in addition to providing insight into any system
14
problems. Also, make-up water as well as water for
14
the initial system fill should be provided through a
water softener. Additionally, chemical treatment of
the system water is advisable. Contact a qualified
boiler water chemical treatment company for their
recommendations. See Section VI, Step ""E. Boiler
Water Treatment" for more information.
Decibel Levels
Front
Rear
Tube Side
68
61
63
67
60
61
67
60
61
62
62
66
62
62
66
Right Side
64
63
63
61
61
39

Advertisement

Table of Contents
loading

Table of Contents