Preparing For Installation; Tools Required - HP NetServer LH 6000 Installation Manual

Table of Contents

Advertisement

Chapter 13
the room's ambient temperature. Ensure the temperature within the rack
itself does not exceed 35°C (95°F).
Reduced Airflow - As you mount equipment in the rack, make sure that
you allow enough airflow for safe operation of the equipment.
Circuit Overloading - Make sure that the total configuration of equipment
in the rack does not overload the supply circuit. To this end, check the
nameplate ratings on all equipment. Consider the effect of circuit
overloading on overcurrent protection and supply wiring.
l
Reliable Earth Grounding - Maintain reliable earth grounding of
rack-mounted equipment. Give particular attention to supply connections
that are not direct connections to the branch circuit: for example, the use of
power strips.

Preparing for Installation

You should plan the placement of your HP NetServer LH 6000r and other rack
components before proceeding with installation. Proper placement is vital for both
safety and operating efficiency.
The rack-optimized HP NetServer LH 6000r fits into 19-inch-wide EIA (Electrical
Industry Association) racks. Vertical space in the rack is measured in standard
EIA units. One EIA unit is 1.75 inches (44.45 mm). The HP NetServer LH 6000r
requires 8 EIA units of space.
STOP!
Read the HP NetServer Rack Installation Road Map before
installing the HP NetServer LH 6000r. The Roadmap contains
important information you need to know for installing
components in the rack.

Tools Required

The following tools are required to install the HP NetServer:
Small adjustable open-end wrench
Torx T-15 and T-25 drivers
Hewlett-Packard Systems Rack template
Tape or a marker pen to mark mounting locations
All manuals and user guides at all-guides.com
Alternative Rack Mounting
149

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netserver lh 6000rNetserver lc2000r

Table of Contents