CYBEX CI-ABBA Assembly Instructions Manual page 25

Abdominal / back extension
Table of Contents

Advertisement

Cable Routing
1. Route cable through pulley brackets on the base frame assembly and up through the pulley bracket on the input arm assembly
with pulleys.
2. Thread cable end through the jam nut and into the rod end bearing a minimum of 12mm.
Item
1
2
3
Page 23 of 38
Description
Rod End Bearing
Nut, M10, Hex Jam
Cable
Qty.
1
1
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ion series1017130-0001 aa

Table of Contents