CYBEX CI-ABBA Assembly Instructions Manual page 16

Abdominal / back extension
Table of Contents

Advertisement

5. Route cable up through the top of the tower frame and down through the side tube of the frame.
6. Install screws, washers, spacers, and nuts securing the pulleys to the top of the tower frame using an 8mm Allen wrench and
17mm wrench.
NOTE: Make sure the spacers are centered and inside the tube wall.
NOTE: Make sure cable is routed over the pulleys and underneath the pins in the tower frame.
7. Flex rear shroud into position inside the tower frame.
Item
1
Item
1
2
3
4
5
6
7
Tighten hardware to 14-16 ft-lb (19-21.7 Nm).
Page 14 of 38
Description
Cable
Description
Pulley, 3.5" OD
Pulley, 4.5" OD
Cable
Screw, M10 x 1.5, 55mm
Nut, M10 x 1.5, Hex Nylock
Washer, Flat 3/8" ID
Bushing
Qty.
1
Qty.
1
1
1
2
2
4
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ion series1017130-0001 aa

Table of Contents