Fujitsu PRIMERGY GX2560 M7 Upgrade And Maintenance Manual page 303

Table of Contents

Advertisement

▶ Install the CPU LC kit, see
▶ Connect all cables to the system board:
For the cable plan, see
Concluding steps
▶ Install all memory modules, see
Ensure that you install each memory module in the slot it was located
before the replacement.
"Installing the fan cage" on page
"Installing the crossbar" on page
"Installing the air duct" on page
▶ Install all riser modules, see
"Reassembling" on page
▶ Connect all external cables.
"Connecting the power cord" on page
"Verifying the system time settings" on page
"Updating the BIOS and BMC" on page
▶ I applicable, reconfigure the BIOS/iRMC configuration information, see
"Using the Chassis ID Prom Tool" on page
"Looking for the MAC address of a LAN controller" on page
"Updating the NIC configuration file in a Linux environment" on page
▶ If applicable, reconfigure your network settings in the operating system
according to the original configuration of the replaced controller (expansion
card or onboard).
Configuration of network settings should be performed by the
customer. For more information, see
recovery" on page
▶ If applicable, restore LAN teaming configurations.
GX2560 M7
"Installing the CPU LC kit" on page
"Appendix B" on page
"Installing a memory module" on page
76.
68.
59.
"Installing the riser module" on page
49.
56.
298.
Upgrade and Maintenance Manual
System board and components
325.
94.
91.
96.
"Note on network settings
239.
171.
64.
99.
97.
303

Advertisement

Table of Contents
loading

Table of Contents