Fujitsu PRIMERGY GX2560 M7 Upgrade And Maintenance Manual page 301

Table of Contents

Advertisement

▶ Use both hands to lift the system board carefully out of the chassis.
CAUTION
Always take the system board with both hands!
Never lift the system board one-sided or at a heat sink,
because the solder connections between the socket and the
system board come under tension and increase the risk of
damage and malfunction!
Do not damage the EMI springs which are essential to comply
with applicable EMC regulations and satisfy cooling
requirements and fire protection measures.
Take care of the buttons on the system board.
▶ Place the removed and the new system board on an antistatic surface.
Installing the new system board
▶ Check the settings on the new system board, see
page
322.
▶ Insert the system board into the chassis in slight angle.
Take care of the buttons on the system board.
Make sure that the four busbars are firmly seated.
▶ Fasten the system board with 15 screws, see
screws.
▶ For Japan / APAC / North America only:
Replace the CMOS battery installed on the new system board with a new
CMOS battery (see
charging of CMOS battery might be reduced during stocked in warehouse.
For servers with Air Cooling:
GX2560 M7
"Replacing the CMOS battery" on page
Upgrade and Maintenance Manual
System board and components
"Onboard settings" on
Figure 282 Position of the
284), because
301

Advertisement

Table of Contents
loading

Table of Contents