For more detail configuration , see configuration guide for each product . you can download configuration guide at http://www.ruijienetworks.com For more technical enquiry , you can visit Ruijie Service portal at http://case.ruijienetworks.com . You need to sign up before submit a case.
Confirmation Position Other Modules Note: Engineers who install such switches for the first time should read the RG-S8600E Series Switch Hardware Installation and Reference Guide. Safety notes: Do not install the device in a moist place and keep the device away from liquid.
Page 5
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Pre-installation confirmation The depth of the cabinet for accommodating an S8610E switch chassis must be greater than or equal to 100 cm.
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Unpacking Product information Required tools: Flat-head screwdriver Hammer Unpacking instruction It is recommended to wear gloves to prevent injuries.
Page 7
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Conveying: It is recommended that four persons convey the device simultaneously. The empty chassis (including fans) weighs 104 kg for the S8610E , 30 kg for S807E and 20kg for S8605E. Notes: Do not hold panels, power module handles, or chassis handles during conveying.
Page 8
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Installing cable management brackets 1. The RG-S8610E cable management bracket is mounted before delivery while the cable management bracket is not mounted on the RG-S8605E and RG-S8607E before delivery.
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Installing cable management brackets S8610E cabling figure: S8610E...
Page 10
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules The cabinet depth should be greater than or equal to 1 m. The distance between the column mounting bar of the cabinet and the outer side of the front cabinet door should be greater than 180 mm and the thickness of the...
Page 11
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules Installing the chassis in a standard 19-inch cabinet by using a pallet or slide rail (recommended): 1. The S8610E chassis is very heavy (the heaviest one chassis with fully line cards weighs more than 135 kg.
Page 12
Hardware Installation Installing the Device Installing Power Check and Preparations to a Specified Grounding Modules, Cards, and Confirmation Position Other Modules There is a ground bar in the installation environment (recommended): ① Remove ground screws from the rear panel of the chassis.
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing power modules: S8610E Power module slots are all at the rear of chassis, as shown in the following figures: POE Power Module System Power Module S8607E...
Page 14
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing power modules: 1) Operators should wear ESD wrist straps, ensure that the ESD wrist straps are in good contact with the skin, and the ESD wrist straps are properly grounded.
Page 15
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing power modules: 4) Ensure that the power module is in the correct direction (if the power module is upside down, it cannot be inserted into the power slot smoothly due to designed structure restrictions).
Page 16
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing power modules: 5) After connecting a power cable to the power module, use a fastener to fasten the power cable prevent it from falling during use, as shown in the following figure.
Page 17
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing fan modules (assembled before shipment): Positions of fan modules in chassis are as shown in the following figures: Fan Tray S8607E S8605E...
Page 18
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing fan modules (assembled before shipment): Positions of fan modules in chassis are as shown in the following figures: S8610E Front Fan Tray Rear Fan Tray...
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing fan modules: 1) Fan modules are components included in the standard configuration before shipment. In general, they do not need to be installed on site but operators need to check whether all fans are installed inside the fan modules.
Page 20
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing fan modules: 4. Insert the new fan module, ensure that the fan module is in the correct direction (if the fan module is upside down, it cannot be inserted into the slot smoothly due to designed structure restrictions).
Page 21
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing cards (FE cards, line cards, and supervisor): S8610E Supervisor Line cards Fabric Engine...
Page 22
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing cards (FE cards, line cards, and supervisor): S8607E Supervisor Line cards S8605E...
Page 23
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing cards (FE cards, line cards, and supervisor): Note: For FE card, line card, and supervisor slots, only one slot has no filler panel installed in the standard configuration of a chassis before shipment.
Page 24
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing cards (FE cards, line cards, and supervisor): ①Before inserting a card into a slot, check whether the backplane connector of the card is damaged, and use a flashlight to check whether backplane connector pins of the chassis are deformed.
Page 25
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing cards (FE cards, line cards, and supervisor): Notes: Line cards use self-locking levers. When you use self-locking levers to insert a card into a slot of the chassis, the self-locking levers automatically lock the card, as shown in the following figure.
Page 26
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing air filter modules: Note: air filter modules are not included in the standard configuration. They are equipped when customers request them.
Page 27
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Installing air filter modules: For the S8610E, there are two types of air filter modules. One type of air filter modules are installed at the bottom of the chassis (used for preventing dusts for line card and supervisor slots), as shown in the following figure on the left, and the other type of air filter modules are installed inside the front fan panel (used for preventing dusts for FE card slots), as shown in the following figure on the right.
Page 28
Hardware Installation Installing the Installing Device to a Power Modules, Check and Preparations Grounding Specified Cards, and Confirmation Position Other Modules Cabinet check Check whether the external power supply matches the power distribution panel of the cabinet. Check whether front and rear doors can be closed successfully after the device is installed. Check that the cabinet is fastened securely and the cabinet will not move or topple.
Page 29
Summary ■ Installation preparations: The cabinet depth should be greater than or equal to 1 m. ■ Installation in a cabinet (four persons are recommended for the operation) ■ Cable management bracket installation ■ Grounding ■ Installation of power modules (AC 16 A power cables and sockets, and 10 A power cables and sockets) ■...
Obtaining Help Self-service • Official website of Ruijie Networks: www.ruijienetworks.com • Downloading of software and documents: www.ruijienetworks.com/service.aspx ftp: //partnetportal.ruijienetworks.com Remote technical support • Fault submission: case.ruijienetworks.com • Live Chat(Skype): service_rj@ruijienetworks.com...
Need help?
Do you have a question about the S8600E Series and is the answer not in the manual?
Questions and answers