Manual Regeneration; Manual Delayed Regeneration; Immediate Regeneration; To Advance Regeneration Cycles - Pentair FLECK 9000 SXT Installer Manual

Hide thumbs Also See for FLECK 9000 SXT:
Table of Contents

Advertisement

8.3.

Manual regeneration

Mandatory
The controller must be in service in order to enable this procedure.

8.3.1. Manual delayed regeneration

Note
This option is not available in mode FI.

8.3.2. Immediate regeneration

A
Press and hold
the programmed regeneration control type.

8.3.3. To advance regeneration cycles

A
Press
to pass to the next regeneration cycle.
8.4.

Operation during a power failure

Current valve position, cycle step time elapsed, and time of day is stored 24 hours during a power
failure, and will be restored upon power restoration;
in regeneration, when power is shutting down, the controller saves the current regeneration
data. When power is restored, the controller resume the regeneration cycle at the point where
power failed;
Caution
Without power, the valve stay in its current position. The system should include all required
safety components to prevent overflows.
all the program settings are stored in a permanent memory;
time is kept during a power failure and the time of day is adjusted upon restoration of the power
(as long as the power is restored within 24 hours);
the time of day on the main display screen will flash when there has been a power failure;
the flashing of the time of day can be stopped by pressing any button on the display.
Ref. MKT-IM-020 / B - 08.06.2018
for 5 seconds to initiate immediate manual regeneration regardless from
Installer Manual Fleck 9000 - SXT - Operation
65 / 108

Advertisement

Table of Contents
loading

Table of Contents