Valve & Second Tank Adapter On Tank Assembly - Pentair FLECK 9000 SXT Installer Manual

Hide thumbs Also See for FLECK 9000 SXT:
Table of Contents

Advertisement

Installer Manual Fleck 9000 - SXT - Maintenance
9.2.9. Valve & second tank adapter on tank assembly
No.
A
Lubricate the seals with approved silicone grease.
B
Spin the valve (1) onto the tank (2), ensuring the threads are not cross-threaded.
C
Rotate the valve (1) clockwise and freely, without using force until it comes to a stop.
Note
This stop position is considered point zero.
D
Rotate the valve (1) clockwise from point zero to between ¼ turn and ½ turn.
Caution
Do NOT exceed 27 Nm of torque when installing the valve. Exceeding this limit may damage
the threads and cause failure.
Point 0
Point 0
84 / 108
Operation
¼ turn
Point 0
¼ turn
Point 0
Ref. MKT-IM-020 / B - 08.06.2018
½ turn
½ turn

Advertisement

Table of Contents
loading

Table of Contents