JOB SPECIFICATION SHEET TABLE OF CONTENTS Job Number: ________________________________________ JOB SPECIFICATION SHEET ..........2 Model Number: ______________________________________ EQUIPMENT CONFIGURATION ..........2 Water Test: _________________________________________ INSTALLATION & START-UP ..........3 Capacity Per Unit: ____________________________________ 9000/9100/9500 (3200 SERIES) ELECTRO MECHANICAL Mineral Tank Size: ________ Diameter: ______Height: ______ TIMER ASSEMBLY ............6 Brine Tank Size and Salt Setting per Regeneration: _________ POWER HEAD ASSEMBLY ...........8...
INSTALLATION & START-UP 11. Place approximately 1 inch (25 mm) of water above the grid plate. If a grid is not utilized, fill to the top of the air check in the salt tank. Do not add salt to the brine tank at this time. Water Pressure 12.
Page 4
7 Release Compound is used in the ® pins at the higher numbered end of this section as required. manufacture of Pentair control valves. The use of The number of pins multiplied by two equals minutes of other types of lubricants may attack the control’s plastic or rubber components.
Page 5
INSTALLATION & STARTUP CONTINUED 4. Because the control valve regenerates with soft water from the other tank, subtract the water used for regeneration. Changing Length of Brine Tank Refill Time Take each regeneration cycle and calculate the water used. The second group of holes on the program wheel determines Example: Unit is set for a 16-inch diameter tank with 4 ft the length of time the water conditioner refills the brine tank resin and salted at 8 lbs.
Page 6
INSTALLATION CONTINUED 9000/9100/9500 (3200 SERIES) ELECTRO MECHANICAL TIMER ASSEMBLY Meter Dome and Union Orientation Control valves outfitted with an electromechanical timer and stainless steel water meter include a special male x female threaded stainless steel union to insure proper installation and operation of the water meter.
9500 CONTROL VALVE ASSEMBLY OPTIONAL 1600 INJECTOR BR61500-9500 Rev E Item No. Part No. Description Item No. Part No. Description 1 ....1 ..16919-01 ..Valve Body, 9500, Machining 16 ....1 ..14921 ....Link, Piston Rod 2 .....16 ..16101 ....Seal, 2850, 4500 17 ....2 ..
Page 17
9500 CONTROL VALVE ASSEMBLY CONTINUED Item No. Part No. Description Item No. Part No. Description ..14801-04C ..Nozzle, Injector, 4C, Green Plastic ..14801-05C ..Nozzle, Injector, 5C, White ..60480-03 ..Injector Assy, 1600, #3, Plastic ..14801-06C ..Nozzle, Injector, 6C, Red ..
Page 18
9500 CONTROL VALVE ASSEMBLY CONTINUED Item No. Part No. Description Item No. Part No. Description NPT, 8.0 GPM NPTF, 4.5 GPM ..60708-9.0 ..DLFC, 1 inch F x 3/4 inch F, ..60721-50 ..DLFC, 1 inch F x 1 inch F, NPT, 9.0 GPM NPTF, 5.0 GPM ..
1-INCH METER ASSEMBLY Item No. Part No. Description Item No. Part No. Description 1 ..... 4 ..12112 ....Screw, Hex Hd Mach 10-24 ..60389-001NP ..Meter Assy, 1-inch Dual Port, NPT, STD, BRS BDY, 560CD, x 1/2 PDL, W/CLPS 2 ..... 1 ..15218 ....Meter Cap Assy, Brass, ..
Page 25
1-1/2 INCH BRASS METER ASSEMBLY Item No. QTY Part No. Description Item No. Part No. Description 12 ..... 60610-02 ..Meter Assy, 1-1/2 inch, NPT, 1 ....1 ..17569 ....Body, Meter, 2850/9500 STD, Brass Paddlewheel 2 ....1 ..13882 ....Post, Meter Impeller ..
Page 26
1-1/2 INCH STAINLESS STEEL METER ASSEMBLY IMPORTANT: For valves equipped with electromechanical timers and stainless steel meters, refer to the Meter Dome and Union Orientation section. Item No. Part No. Description Item No. Part No. Description 3 ....1 ..44024 ....Union, 1-1/2 inch, NPT 1 ....1 ..
GENERAL SERVICE HINTS FOR METER CONTROL Problem: Softener delivers hard water Reason: Reserve capacity has been exceeded. Correction: Check salt dosage requirements and reset program wheel to provide additional reserve. Reason: Program wheel is not rotating with meter output. Correction: Pull cable out of meter cover and rotate manually. Program wheel must move without binding and clutch must give positive clicks when program wheel strikes regeneration stop.
TROUBLESHOOTING Problem Cause Correction Water conditioner fails to Electrical service to unit has been Assure permanent electrical service (check fuse, regenerate. interrupted plug, pull chain, or switch) Timer is defective. Replace timer. Power failure. Reset time of day. Hard water. By-pass valve is open.
WATER CONDITIONER FLOW DIAGRAMS 3 Tanks Switching Position 1 In Service Position (Meter Initiated Regeneration) 4 Brine Draw Position 2 Backwash Position 5 Slow Rinse 44 • FLECK 9000/9100/9500 Service Manual ®...
Page 45
WATER CONDITIONER FLOW DIAGRAMS CONTINUED 8 In Service Position, Tanks Switched 6 Brine Tank Fill Position 7 Rapid Rinse Position FLECK • 45 9000/9100/9500 Service Manual ®...
Page 50
For a detailed list of where Pentair trademarks are registered, please visit waterpurification.pentair.com/brands. § Pentair trademarks and logos are owned by Pentair plc or its affiliates. Third party registered and unregistered trademarks and logos are the property of their respective owners.
Page 52
For a detailed list of where Pentair trademarks are registered, please visit waterpurification.pentair.com/brands. § Pentair trademarks and logos are owned by Pentair plc or its affiliates. Third party registered and unregistered trademarks and logos are the property of their respective owners.
Need help?
Do you have a question about the FLECK9000 and is the answer not in the manual?
Questions and answers