Installer Manual Fleck 9000 - SXT - Programming

6.5.13. Regeneration cycle step duration

Set the duration in minutes of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
6.5.13.1 Regeneration abbreviations
B1:
first backwash
B2:
second backwash
BD:
brine draw
6.5.13.2 For pre-set regeneration cycles
AC Press
or
AD Press
to validate the selection and move to the next parameter.
6.5.13.3 For regeneration type Other
Note
The regeneration cycles are identified as R1 to R6.
AE Press
or
AF Press
to validate the selection and move to the next regeneration
cycle.
AG Repeat AB and AC for each cycle.
56 / 108
to set the regeneration time.
to set the regeneration time of this cycle.
BF:
brine fill
BW:
backwash
RR:
rapid rinse
Ref. MKT-IM-020 / B - 08.06.2018