6.5.12. Regeneration time (RT)

Set the regeneration time.
Note
Regeneration time is the time of the day when regenerations occur for delayed regeneration
of any type and calendar override regeneration.
X
Press
or
Y
Press
to validate the selection and move to the next parameter.

6.5.13. Regeneration cycle step duration

Set the duration in minute of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
6.5.13.1 Regeneration abbreviations
B1
First backwash
B2
Second backwash
BD
Brine draw
6.5.13.2 For pre-set regeneration cycles
Z
Press
or
AA Press
to validate the selection and move to the next parameter.
48 / 94
to set the regeneration time.
to set the regeneration time.
BF
Brine fill
BW
Backwash
RR
Rapid rinse