Installer Manual Fleck 5800 - SXT - Programming
6.5.12. Regeneration time (RT)
Set the regeneration time.
Note
Regeneration time is the time of the day when regenerations occur for delayed regeneration
of any type and calendar override regeneration.
AA Press
or
AB Press
to validate the selection and move to the next parameter.
6.5.13. Regeneration cycle step duration
Set the duration in minutes of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
Note
The abbreviations used are listed on chapter 6.5.13.1.
6.5.13.1 Regeneration abbreviations
B1
First backwash
B2
Second backwash
BD
Brine draw
BF
Brine fill
BW
Backwash
LC
Last cycles
6.5.13.2 For pre-set regeneration cycles
AC Press
or
AD Press
to validate the selection and move to the next parameter.
56 / 92
to set the regeneration time.
to set the regeneration time.
RF
Refill
RR
Rapid rinse
SP
Service position
SR
Slow rinse
SV
Service
Ref. MKT-IM-004 / A - 18.04.2017