*Minimum number of piers shown for pier-mounted unit. See
table on right for number of equally spaced piers required.
For each additional 8 ft of unit length, add 2 piers.

INSTALLATION

This section describes how to install 39M units, components, and
component parts. Units specified on a single order are shipped
with most components assembled in the specified airflow direc-
tion. When an upper component exceeds the 108-in. maximum
height limit, it is shipped out of its operating position. Some com-
ponent parts also require assembly or adjustment; see the section
on each component type for specific instructions.
CAUTION
Failure to assemble the units according to the procedures set
forth below is considered improper installation and abuse and
may not only negatively impact the weathertight performance
of the unit, but may also negatively affect the Carrier warranty.
Indoor and Outdoor Unit Shipping Split (All
Sizes)
NOTE: The following hardware is included with the unit:
2 per split —
/
in.-16 nut
3
8
2 per split —
/
in.-16 x 8 in. screw
3
8
2 per split —
/
in. washer
3
8
2 per split —
/
in.-13 nut
1
2
2 per split —
/
in.-13 x 8 in. screw
1
2
2 per split —
/
in. washer
1
2
1 per Intelliclamp
connector —
1
1 per Intelliclamp connector —
Stacked units also include size AB
ies with unit size) and gasket required for field installation.
1. Intelliclamp is a trademark of Industrilas.
W
Fig. 24 — Pier or Beam Mounting
/
in.-18 nut
5
16
/
in.-18 x 2
/
screw
5
1
16
2
/
/
screws (quantity var-
1
3
4
4
BEAM MOUNT
PIER MOUNT*
L
QUANTITY OF PIERS REQUIRED
UNIT LENGTH "L", FT
0-8
4

NON-STACKED UNITS

1.
The 39M split units will arrive at the jobsite in separate pieces
with section to section gasket installed. If the gasket is dam-
aged, obtain the required length of 0.25 in. x 1.50 in. closed
cell gasketing locally (i.e., McMaster 8694K94 or Grainger
6YLW0).
2.
Refer to unit nameplate (Fig.1 and 2) for sequence of sections.
3.
Set upstream section on roof curb first for outdoor units or on
the pad for indoor units.
4.
Remove shipping cover. If section has a Single Point Power
harness split tags (Fig. 25), verify that the downstream sec-
tion has split tags for the power plug connectors.
SHIPPING
TAGS
Fig. 25 — Location of Single Point Power Harness
92