Hot Gas Bypass - Carrier Aero 39MN MW03-110 Series Installation, Start-Up And Service Instructions Manual

Indoor and weathertight outdoor air handlers
Table of Contents

Advertisement

30 minutes may be required for the new balance to take place after
an adjustment is made.
NOTE: Some valve bodies (G, EG, C, S, EBS and EMC) have
a packing nut around the adjustment stem. It may be necessary
to loosen the packing nut slightly to turn the adjusting stem.
Do not forget to retighten the nut after the superheat is set.

Hot Gas Bypass

When low-load operation requires use of hot gas bypass, hot gas
must be introduced between expansion valve and distributor.
Install auxiliary hot gas bypass side connector (field-supplied) in
coil split that is first-on, last-off.
See Table 34 for auxiliary side connector sizes. Do not attempt to
use a valve that is smaller or larger than distributor size. Inserting a
SPORLAN
CARRIER
TYPE
PART NO.
INLET — ODM SOLDER OUTLET — ODF SOLDER AUXILIARY — ODF SOLDER
ASC-5-4
ASC-7-4
EA19BA504
ASC-9-5
EA19BA705
ASC-11-7
EA19BA905
ASC-13-9
DIMENSIONS (in.)
SPORLAN
A
B
TYPE
ASC-5-4
5
/
ODM
5
/
ODF
8
8
ASC-7-4
/
ODM
/
ODF
7
7
8
8
ASC-9-5
1
1
/
ODM
1
1
/
8
8
ASC-11-7
1
3
/
ODM
1
3
/
8
8
ASC-13-9
1
5
/
ODM
1
5
/
8
8
LEGEND
ODF
— Outside Diameter, Female
ODM
— Outside Diameter, Male
Fig. 109 — Distributor and Hot Gas Bypass Auxiliary Side Connector
Table 34 — Auxiliary Side Connector (Hot Gas Bypass) Data
CONNECTION SIZES (IN.)
5
/
8
7
/
8
1
1
/
8
1
3
/
8
1
5
/
8
C
D
E
F
1.88
0.95
1.25
1
/
ODF
2
2.25
1.06
1.38
/
ODF
1
2
ODF
2.81
1.47
1.62
5
/
ODF
8
ODF
3.53
1.89
2.19
7
/
ODF
8
ODF
3.72
1.83
2.75
1
1
/
8
bushing at the outlet will defeat the purpose of the internal nozzle
tube extension.
Install the side connector as follows:
1. Remove distributor nozzle and retainer ring (area A) from
distributor and reinstall in inlet (area B) of side connector.
See Fig. 109.
2. Solder field-supplied extension nipple to coupling on dis-
tributor, then to side connector outlet, using a silver solder
or equivalent with a melting point of 1300 to 1500°F. Ex-
tension nipple should be as short as possible.
3. Solder expansion valve outlet to side connector using 95-
5 tin-antimony soft solder, for easy removal.
4. If required, install field-supplied adapter bushing or cou-
pling to connector inlet before soldering to expansion
valve outlet.
5
/
1
/
8
7
/
1
/
8
1
1
/
5
/
8
1
3
/
7
/
8
1
5
/
1
1
8
ODF
a39-2994ef
DISTRIBUTOR
DISCARD CAP
WITH TESTPORT
141
USED WITH SPORLAN
DISTRIBUTOR TYPE
1620, 1622
2
1112, 1113
2
1115, 1116
8
1117, 1126
8
/
1125, 1127, 1143
8
SIDE
CONNECTOR
NOZZLE
SIZE
J
G
E
C
A
a39-
2040tf

Advertisement

Table of Contents
loading

Table of Contents