Accessories - Thermo Scientific A 40B Manual

Thermostats & refrigerated bath circulators
Table of Contents

Advertisement

Lifting
Platform
Installation
CAUTION
Thermo Scientific

Accessories

Section 5
Tools required:
• Torx Head screwdriver
• M15 or adjustable wrench
Procedure:
Always turn off the unit and disconnect the power cord from the power
source before installing the platform.
1.
Undo the four thumbscrews securing the thermostat to the bridge and re-
move it.
2.
Undo the four Torx head screws securing the bridge to the bath and remove
the bridge.
3.
Secure the stacks to the platform.
stalled into the hole on the platform as shown.
4.
Insert the sockets into the holes on the top of the bridge. Secure the sockets
to the bridge using a M15 nut on the bottom of each socket.
5.
Slide the stacks up and through the sockets on the bridge.
6.
Install a male knurled nut into each socket and install a female knurled nut to
the top of the stack.
7.
Place the assembly in the bath and secure it to the unit using the four Torx
head screws.
8.
Place the thermostat on the bridge and secure it using the four thumbscrews,
hand tight.
9.
Place the lifting platform to the desired position and lock it by using the
male knurled nuts.
NOTE the long end of the stack is in-
Female Knurled
Nut (0032720)
Socket (0032718)
Male Knurled
Nut (0032721)
Bridge Position
Stack (0032325)
M15 Nut (9000144)
Platform(Typical)
5-1

Advertisement

Table of Contents
loading

Table of Contents