Download Print this page

Sinclair SDV 6 SWC-61 User & Installation Manual page 54

Advertisement

3. SDV6 IDU check list
No.
Displayed Content
1
IDU address
2
Capacity HP of IDU
3
Actual set temperature Ts
4
Current running set temperature Ts
5
Actual T1 indoor temperature
6
Modified indoor temperature T1_modify
7
T2 heat exchanger intermediate temperature
8
T2A heat exchanger liquid pipe temperature
9
T2B heat exchanger gas pipe temperature
10
Actual set humidity RHs
4. ODU check list
Display
SDV5 unit
1
ODU address
2
Unit capacity
3
Number of ODUs
4
--
5
ODU capacity
demand
Compressor 1
6
frequency
Compressor 2
7
frequency
No.
11
12
13
14
15
16
17
18
19
20
SDV5 mini unit
Inverter split
ODU address
ODU address (00) ODU address
Unit capacity
Unit capacity
Number of ODUs
Number of ODUs
--
--
ODU capacity
ODU load target
demand
Compressor 1
Operating frequency
frequency
--
--
51
Displayed Content
Actual RH indoor humidity
Actual fresh air processing unit TA air supply temperature
Air-blow pipe temperature
Compressor discharge temperature
Target superheat
EXV opening (actual opening/8)
Software version No.
Historical error code (recent)
Historical error code (sub-recent)
[―――] is displayed
SDV6 unit
ODU capacity
ODU Qty
IDU Qty settings
ODU capacity
demand
Actual frequency
of compressor 1
Actual frequency
of compressor 2
Description
0 to 3
Unit: HP
1 to 4
Only displayed on the
master unit, while the
slave unit displays 0.
Actual Frequency
Actual Frequency

Advertisement

loading