8. Commissioning

8.1 Commissioning tasks

For commissioning to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have 
been completed.
Tools
none
1.
Assembly finished including subsequent leakage test
Automatic discharge
none
Preparation of installation
Illustration
Mechanically open
Illustration
1
3
2
Prerequisites
Material
Description
1. Set the knurled screw on the float 
drain from >>Mechanically open<<
anti-clockwise (left-hand thread) to
>>Automatic discharge<<
Description
2. Open the shut-off valve [1] on the inlet
side slowly
3. Open the shut-off valve [2] on the outlet
side slowly
4. Close the shut-off valve [3] of the bypass
pipe
CLEARPOINT
water separator
®
Protective equipment
None