8. Commissioning
8.1 Commissioning tasks
For commissioning to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
none
1.
Assembly finished including subsequent leakage test
Automatic discharge
•
none
Preparation of installation
Illustration
Mechanically open
Illustration
1
3
2
Prerequisites
Material
Description
1. Set the knurled screw on the float
drain from >>Mechanically open<<
anti-clockwise (left-hand thread) to
>>Automatic discharge<<
Description
2. Open the shut-off valve [1] on the inlet
side slowly
3. Open the shut-off valve [2] on the outlet
side slowly
4. Close the shut-off valve [3] of the bypass
pipe
CLEARPOINT
water separator
®
Protective equipment
•
None