CLEARPOINT
®
water separator
11.2 Disassembly work
For disassembly to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have been
completed.
Tools
•
Screwdriver - cross-head
size 2.5 mm
1.
Open the bypass pipe if available
Illustration
1.
42 | 56
Prerequisites
Material
•
none
Preparation of installation
Description
1.
1. Close the shut-off valves upstream and downstream
of the separator or the respective system section,
depressurise the separator and secure the system
against unintentional pressure build-up
2. When the BEKOMAT
from the bottom part of the housing
For further information see the enclosed installation and
operating manual for the BEKOMAT
Installation and operation manual
Protective equipment
•
Protective gloves (fluid-
resistant)
•
Safety goggles with side shields
•
Hearing protection
•
Respiratory protection,
protection class FFP 3
•
Safety footwear
is used, it must be disconnected
®
®