5. Install the DIMM.
6. Install the access panel ("Installing the access panel" on page 23).
7. Install the bezel ("Unlocking the bezel" on page 22).
8. Power up the server ("Powering up the server" on page 21).
Hard drives
The server supports the following hard drives:
•
Non-hot-plug SCSI
•
Non-hot-plug SATA
•
Hot-plug SCSI
•
Hot-plug SAS
•
Hot-plug SATA
Hot-plug SATA hard drives are interchangeable with hot-plug SAS hard drives
when the optional SAS controller ("SAS controller" on page 45) is installed.
Server model
Non-hot-plug SATA
Hardware options installation
Drives supported
Additional required
components
SATA
N/A
39
Need help?
Do you have a question about the ProLiant ML310 Generation 3 and is the answer not in the manual?
Questions and answers