Before performing the following steps, make sure that the forklift or pallet lift can support the
cabinet's weight (see
2. Please move the UPS together with the pallet to the installation site or a place far away from the
installation site by a forklift or pallet lift.
CAUTION
Do not tilt the cabinet more than 10° from vertical line, otherwise the cabinet may tip over.
3. Open the carton (20–40k) or wooden box (60–80k), and remove the cushioning materials and damp-
proof bag (
Figure 4-1
4. Move the equipment from the pallet onto the ground
a
20–40k, remove the screws fixing the equipment and the retaining rack at the bottom, and move
the equipment onto the ground (
b
60–80k, lay the slope board in front of the pallet. Then remove the retaining rack at the bottom of
the equipment. At last, slowly slide the equipment onto the ground along the slope board (
4-2
).
CAUTION
When lifting or moving the cabinet, to prevent damage to the wiring channels and wiring in the
base, please make sure that the forklift fork is inserted into the forklift slot horizontally; do not tilt
the fork upwards; and the fork must pass through the entire pallet base..
5. Move the equipment to the installation site by using the casters on the bottom.
6. For installing the UPS system, please see Section
NOTE
During the installation waiting period, the unpacked cabinet shall be protected against moisture,
dust and other contaminants. The warranty does not cover any damages caused by failure to
properly store or protect the UPS.
Copyright © 2022 Santak Corporation plc. All rights reserved.
Table 3-1
for the cabinet's weight).