14. Drag a point node in the project editing page to set as the robot's initial work point.

Figure 43: Point Node

15. Drag a CVNewObj node in the project editing page and choose the conveyor number.

Figure 44: Select conveyor

Click the pencil icon of the CVNewObj node for the Time Out setting. For details, refer to 4.3.1.

Figure 45: Set CVNewObj

16. Drag a CVPoint node in the project editing page and choose the conveyor number.