Perkins 402J-05 Operation And Maintenance Manual page 36

Operation and maintenance manual
Table of Contents

Advertisement

36
Operation Section
Product Storage
Product Storage
Perkins are not responsible for damage which may
occur when an engine is in storage after a period in
service.
Your Perkins dealer or your Perkins distributor can
assist in preparing the engine for extended storage
periods.
Condition for Storage
The engine must be stored in a water proof building.
The building must be kept at a constant temperature.
Engines that are filled with Perkins ELC will have
coolant protection to an ambient temperature of
−36° C (−32.8° F). The engine must not be subjected
to extreme variations in temperature and humidity.
Storage Period
An engine can be stored for up to 6 months provided
all the recommendation are adhered to.
Storage Procedure
Keep a record of the procedure that has been
completed on the engine.
Note: Do not store an engine that has biodiesel in the
fuel system.
1. Ensure that the engine is clean and dry.
a. If the engine has been operated using
biodiesel, the system must be drained and new
filters installed. The fuel tank will require
flushing.
b. Fill the fuel system with an ultra low sulfur fuel.
For more information on acceptable fuels refer
to this Operation and Maintenance Manual,
"Fluid recommendations". Operate the engine
for 15 minutes in order to remove all biodiesel
from the system.
2. Drain any water from the primary filter water
separator. Ensure that the fuel tank is full.
3. The engine oil will not need to be drained in order
to store the engine. Provided the correct
specification of engine oil is used the engine can
be stored for up to 6 months. For the correct
specification of engine oil refer to this Operation
and Maintenance Manual, "Fluid
recommendations".
4. Remove the fan belt from the engine.
Copyright of Perkins Engine Company Limited. NOT FOR REPRINTING OR RESALE
Sealed Coolant System
i05335259
Ensure that the cooling system is filled with Perkins
ELC, or an antifreeze that meets "ASTM D6210"
specification.
Open Cooling System
Ensure that all cooling drain plugs have been
opened. Allow the coolant to drain. Install the drain
plugs. Place a vapor phase inhibitor into the system.
The coolant system must be sealed once the vapor
phase inhibitor has been introduced. The effect of the
vapor phase inhibitor will be lost if the cooling system
is open to the atmosphere.
For maintenance procedures ref to this Operation
and Maintenance Manual.
Monthly Checks
The crankshaft must be rotated in order to change
the spring loading on the valve train. Rotate the
crankshaft more than 180 degrees. Visibly check for
damage or corrosion to the engine.
Ensure that the engine is covered completely before
storage. Log the procedure in the record for the
engine.
M0087369-08

Advertisement

Table of Contents
loading

Table of Contents