Gather Tools and Supplies
You must have the following to complete this procedure:
A #1 Phillips screwdriver
A #2 Phillips screwdriver
A new LCM module
Note:
After removing the new LCM from its packaging, keep the packaging to
return the old LCM to Spectra Logic.
Power off the Library
To power off the library, press and hold the front panel power button
approximately six seconds or until the button's LED starts flashing. The power-off
sequence takes approximately one minute while the library allows applications to shut
down gracefully (see
Power button
Figure 2 Front panel power button.
Note:
If you intend to leave the library powered down for an extended length
of time, set the main power switches on the back of the library to the off
position.
Remove the Rear Cover
The rear panel components are shielded by a protective cover
remove this cover when replacing the LCM.
1. From the rear of the library, locate the two knurled screws securing the bottom of
the cover to either side of the chassis
6
Resetting the Library on page 14
for important information).
(Figure
3).
(Figure
2) for
(Figure
3). You must
Need help?
Do you have a question about the T-Series Spectra T200 and is the answer not in the manual?
Questions and answers