4.4 Place of installation

4.4.1 UPS location

Note!
UPS installation and connection must be performed only by an ABB Service Technician!
If optional cabinets and accessories are included with the UPS, please refer to those accompanying
manuals for installation and operating instructions.
The UPS is intended for use in electrical rooms.
Do not locate or stock easily flammable materials in the same room as the UPS.
It is important to have a clean, dust-free environment provided with proper ventilation and air-conditioning to
keep the ambient temperature within the specified operating range.
The recommended air inlet temperature is from 68°F (20°C) to 77°F (25°C) (max. 104°F / 40°C).
Refer to Section 4.5.
Check for sufficient floor load capacity before installing the UPS and the Battery.
Refer to Section 4.1.1.
For Battery installation follow the local codes and the recommendation of the Battery supplier.
Note!
Operation at temperatures higher than 77°F (25°C) will reduce Battery life.
Potential consequences are explained in the User Manual to Section 9.1.4: read and understand
them.
The TLE Series 160 to 500 UPS can radiate radio frequency energy.
Although some RFI filtering is inherent to the UPS there is no guarantee that the UPS will not influence sensitive
devices such as cameras and monitors that are positioned close by.
If interference is expected, the UPS should be moved away from the sensitive equipment.
Positioning of the UPS TLE Series 160 to 500
Min.
20" / 500mm
TLE Series 160 - 200 - 225 - 250
Fig. 4.4.1-1 TLE Series 160 to 500 - Positioning of the UPS
Min.
20" / 500mm
TLE Series 300 - 350 - 400 - 500
TLE Series 160 to 500 UL S2B
The rear panel of the UPS may be mounted
flush to a wall or other structure.
Clearance around the front of the unit
should be sufficient to enable free passage
of personnel with the doors fully open, and
to allow sufficient airflow to the door vents.
Check Section 110-26(A) of the NEC code
for specific requirements.
To guarantee proper cooling air exhaust, the
mandatory minimum clearance between
ceiling and top of the UPS is 20" (500 mm).
A single-phase power outlet (120Vac)
should be provided near the UPS for
connection of power tools, test equipment
or connectivity devices.
This outlet must be grounded.
UPS Installation Guide / REV-A