ABB TLE Series Installation Manual page 49

160 to 500 kva ul s2b
Table of Contents

Advertisement

49/62
J1B/1
J1A/1
Fig. 4.9.2-2 Bus connection on first and last units
J1B/2÷5
J1B/1
J1A/2÷5
J1A/1
Fig. 4.9.2-3 Bus connection on intermediate units
TLE Series 160 to 500 UL S2B
J1
B
J2
J1
A
J2
J1
B
J2
J1
A
J2
UPS Installation Guide / REV-A
Note!
Final units, first and
last, of an RPA Parallel
System.
SW1
On the two boards P13/P14 –
IM0222 – Bus Interface Board, of
the first and last units of a Parallel
System,
the
1/2/3/4/5/6 must be in position
ON (see Fig. 4.9.2-2).
Note!
Intermediate units of
an
System.
SW1
On the two boards P13/P14 –
IM0222 – Bus Interface Board, of
the intermediate units of a Parallel
System,
the
1/2/3/4/5/6 must be in position
OFF (see Fig.4.9.2-3).
switches
SW1-
RPA
Parallel
switches
SW1-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle 500 ul s2bTle 160 ul s2bTle 200 ul s2bTle 225 ul s2bTle 250 ul s2bTle 300 ul s2b ... Show all

Table of Contents