TLE Series 160 - 200 - 225 - 250 - Installation notices in case of power connection with Dual Input Utility
Q1
Fig. 4.8.2-3 TLE Series 160 - 200 - 225 - 250 - Interconnection links BR1, BR2 and BR3
For Dual Input Utility, Bypass and Rectifier, the interconnection links BR1, BR2 and BR3 must be
removed (see Fig. 4.8.2-3).
TLE Series 160 to 500 UL S2B
Q1
BR1
(3x20x1mm / L=220mm)
36
36
BR2
(3x20x1mm / L=220mm)
37
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST BE REMOVED
UPS Installation Guide / REV-A
BR1
BR2
BR3
37
BR3
(3x20x1mm / L=220mm)