UPS 1
Fig. 4.4.1-9 TLE Series 160 - 200 - 225 - 250
RPA Parallel System disposition
In case of RPA Parallel System, try to place the UPS modules in sequence of their numbers
(marked on the packing).
If the units are positioned "side by side", the side panels must be mounted on all units.
Remove the side air inlet grids on the intermediate units to run the control bus cable
connections.

4.4.2 Battery location

Battery require a well-ventilated room with controlled temperature to obtain reliable operation.
The Battery can be installed immediately adjacent to the UPS (left or right side) or remotely from the UPS.
If the Battery is installed remotely from the UPS, a wall mounted DC disconnect device must be installed within
line-of-site to both the UPS and the Battery.
The optimal room temperature for Battery location is 68°F (20°C) to 77°F (25°C) and shall never exceed the range -
4°F (-20°C) to 104°F (40°C).
The life of valve-regulated Battery will be reduced by 50% for each additional 18°F (10°C) that the Battery ambient
temperature is above 77°F (25°C).
The Battery system associated with larger UPS is usually either rack mounted or installed in multiple Battery
cabinets.
Installation and assembly must be made according to the local standards and Battery system manufacturer's
recommendations.
The Battery circuit breaker or Battery fuse box must be mounted as near as possible to the Battery.
Warning!
Battery installation and connection must be performed by Qualified Personnel only.
Read all safety instructions before proceeding with the installation (see Chapter 1).
Battery discharging and/or charging activities may cause the emission of hydrogen gas; therefore,
the room requires proper ventilation and fresh air.
Comply with the UL1778-CSAC22.2no170.3 UPS safety standard, ANSI/IEEE P1184 Guide for
Batteries for Uninterruptible Power Supply Systems and applicable codes and governmental
regulations.
UPS
3 - 4 - 5 - 6
UPS 2
TLE Series 160 to 500 UL S2B
UPS 1
Fig. 4.4.1-10 TLE Series 300 - 400 - 500
RPA Parallel System disposition
UPS Installation Guide / REV-A
UPS
3 - 4 - 5 - 6
UPS 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle 500 ul s2bTle 160 ul s2bTle 200 ul s2bTle 225 ul s2bTle 250 ul s2bTle 300 ul s2b ... Show all

Table of Contents