Connectivity Interface - ABB TLE Series Installation Manual

160 to 500 kva ul s2b
Table of Contents

Advertisement

54/62
5

Connectivity interface

J35 P - RS232
Connectivity rack
Q1
TLE Series 160 - 200 - 225 - 250
J35 P - RS232
Connectivity rack
TLE Series 300 - 400 - 500
Fig. 5-1 TLE Series 160 to 500 - Connectivity rack and Serial port J35µP – RS232
TLE Series 160 to 500 has the following equipment's:
Serial Port J35µP - RS232 (see Section 5.1).
Customer Interface board (see Section 5.2).
Connectivity rack ready for the installation of four connectivity boards.
Possible connectivity configurations with TLE Series 160 to 500
5
6
4
3
1
2
17
15
16
14
12
13
Fig. 9-2 Connectivity Slots
Note!
The installation of any option board must be performed only by an ABB Service Technician.
Prior to the installation, connection and cabling of any option board the UPS must be completely
powered down and all the power sources that will be connected to the option board must be de-
energized.
Option board shall be connected only to Safety Extra Low Voltage circuits (SELV for IEC-UL-
CSA60950-1): voltage up to 30Vac / 42.4Vpk or 60Vdc maximum and galvanically separated from
AC Mains supply.
Keep SELV cables separated from high voltage cables.
Connectivity rack
Q1
J2
J3
J5
1
2
11
10
8
9
7
22
21
19
20
18
J4
TLE Series 160 to 500 UL S2B
J35 P - RS232
For a Single UPS it's possible to install the following
connectivity boards:
-
max. 3 "Customer Interface" boards;
- max. 2 "3-ph SNMP/WEB Plug-in Adapter" boards.
For a Parallel System (max. 6 UPS) it's possible to install
the following connectivity boards:
-
max. 3 "Customer Interface" boards for each UPS;
- max. 2 "3-ph SNMP/WEB Plug-in Adapter" boards for
RPA Parallel System.
UPS Installation Guide / REV-A