Regeneration Cycle Step Duration; Day Of Week (Dn, N = 1 To 7) - Pentair FLECK 4600-SXT Installer Manual

Table of Contents

Advertisement

Installer Manual Fleck 4600 SXT - Programming

6.5.13. Regeneration cycle step duration

Set the duration in minutes of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
6.5.13.1 Regeneration abbreviations
B1
First backwash
B2
Second backwash
BD
Brine draw
6.5.13.2 For pre-set regeneration cycles
AA Press
or
AB Press
to validate the selection and move to the next parameter.

6.5.14. Day of week (Dn, n = 1 to 7)

Set the day of week for regeneration.
Note
The day of week parameter is only available if time clock week mode has been set in
controller type selection.
AC Press
or
AD Press
to validate the selection.
AE Repeat AC to AD until D7 is set.
AF Press
to validate the selection and move to the next parameter.
56 / 98
to set the regeneration time.
to set "ON" or "OFF" to set the day as a regeneration day.
BF
Brine fill
BW
Backwash
RR
Rapid rinse
Ref. MKT-IM-028 / A - 03.07.2018

Advertisement

Table of Contents
loading

Table of Contents