Entering Master Programming Mode - Pentair FLECK 4600-SXT Installer Manual

Table of Contents

Advertisement

Parameter
Regeneration
RT
time
B1
First backwash
BD
Brine draw
Second
B2
backwash
RR
Rapid rinse
BF
Brine refill
BW
Backwash
Cycle number
Rn
n=1 to 6
Day of week,
Dn
n=1 to 7
CD
Current day
FM
Flow meter type
K
Meter pulse

6.5.2. Entering master programming mode

A
Press and hold
icon and the parameter display reads TD.
B
Set the time to 12:01 PM with
C
Press
to validate the selection and return to the service mode, or wait
for 10 seconds.
D
Press and hold
the service icon and the display format screen appears.
Ref. MKT-IM-028 / A - 03.07.2018
Options
Definition
00:00:00 to
23:59:59
0 to 199
On - OFF
1 to 7
Day of the week
P0.7
¾" paddle wheel
t0.7
¾" turbine
P1.0
1" paddle wheel
t1.0
1" turbine
P1.5
1½" paddle wheel
t1.5
1½" turbine
P2.0
2" paddle wheel
Generic or
Gen
non-Fleck
0.1 to 999.9
or
until the programming icon replaces the service
or
.
and
until the programming icon replaces
Installer Manual Fleck 4600 SXT - Programming
Regeneration time will not appear
Hour
unless regeneration day override is on.
Only displayed for dF2b regeneration
flow. In case of dF1B, screen shows
BW
BD consists of time for brine draw and
slow rinse.
Only displayed for dF2b regeneration
Minute
flow.
Only if "Othr" is chosen under VT. R1,
R2, R3, etc... will be displayed instead.
Regeneration setting for each day of
-
the week. OFF by default.
Only displayed for generic flow meter
Litre
type.
Note
51 / 98

Advertisement

Table of Contents
loading

Table of Contents