Always install indoors and place the Waterlogic WL2FL Water Treatment System on a firm, flat and
stable surface.
1. Attach the water supply line to the 1/4" feed water inlet bulkhead fitting on the back of the unit.
Waterlogic requires the use of a water pressure regulator. Water feed pressure must be
between 2.7-4bar. Turn on the water supply and check for leaks.
2. Check to ensure that the Red Compressor & Heater switch is the O=OFF position.
NOTE:
Switch has internal LED that illuminates when placed in I=ON position.
3. Connect the power cord to the back of the Waterlogic WL2FL Water Treatment System and toa
220/240 Volt supply.
4. Fill the Cold Tank. Hold a container under the dispensing faucet, press and hold the main
dispensing button until a continuous flow of water is obtained. Once a continuous flow is
obtained, release the dispensing button. Cold Tank is now full.
5. Fill the Hot Tank. Hold a container under the dispensing faucet. Press the Hot Select Button
followed by the main dispensing button until a continuous flow of water is obtained. Once a
continuous flow is obtained, release the main dispensing button. Hot tank is now full.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK.
Red Compressor/Heater Switch must be in the O=OFF position while the hot
tank is empty. Damage could occur within one minute and the overheat (high
limit) will require manual reset if heater is turned on with an empty hot tank.
6. Verify that the UV lamp operates as expected.
WARNING!
ULTRAVIOLET RADIATION. Protect your skin and eyes against ultraviolet rays.
Never look directly at an operating UV light. Always disconnect before removal.
7. Move the Waterlogic WL2FL Water Treatment System into its final operating position. Be sure
that a minimum of 50mm clearance is maintained around both the sides and the back of the unit.
This is important to allow proper airflow and heat exchange of refrigeration system.
8. Level unit using the adjustable feet to level if necessary. Never install on incline.
9. Turn the Red Compressor & Heater Power Switch to I=ON position.
10. When the unit has reached its Hot Temp Set Point, the heater will cycle off.
When the unit has reached its Cold Temp Set Point Temperature, the compressor will cycle off.
11. Once the unit is at the target temperature(s), sample the water to ensure water meets
expectations and additional rinsing or adjustment is not required.
12. Check the WL2FL Water Treatment System for any leaks. External Leak Protection is always
recommended.
WL2FL Manual
Page 48 – Revision AUS-04-23
Need help?
Do you have a question about the PUREZZA WL2FL FIREWALL and is the answer not in the manual?
Questions and answers